Media Summary: For anyone that's ever asked or that we've shown, here is how we pull our Attack line deployment to door approximately 50' from engine. *200' 1.5” 3-stack cross-lay Nimishillen Fire 2024 Hoseload deployment video.
Loading The Double Loop Flat - Detailed Analysis & Overview
For anyone that's ever asked or that we've shown, here is how we pull our Attack line deployment to door approximately 50' from engine. *200' 1.5” 3-stack cross-lay Nimishillen Fire 2024 Hoseload deployment video. This video is part 2 of 5. The video demonstrates how to At Lone Jack Fire, we were discussing and trying several hose loads for the preconnects on Pumper 1. We opted to stay with the ... Flat Load Clinic - Loading the double stack Flat Load
This is the first video of a series of 5. The video demonstrates the fundamental deployment methods and the anatomy of the MDFR ... In this scenario we're going to demonstrate a traditional Split – This method is chosen if the entire 200' is needed for the stretch but the area provided is smaller than the fireman would ... In a side by side comparison, we are going to look at a 2 1/2" Deployment using both the Minuteman